What is the Required Code to Complete Load Bank Testing?

What is the Required Code to Complete Load Bank Testing?


What are the Joint Commission Generator Testing Requirements?

There is no current code for load Bank testing.

The Joint Commission does require one for health care though (only if you cannot meet your 30 minutes of runtime at 30% of nameplate data per month).

For more information on generator load bank testing requirements, request a quote or give us a call at 1-800-899-3931